Why the glass comes last
Frameless panels are cut to the opening that's actually there, down to the slope of the curb and the lean of the walls. Plans can't show that.
Until the tile is set and the valve trim is on, the opening can still change. A measure taken too early means glass that doesn't fit.
Builder glass or your own?
Builders usually offer a standard enclosure, often a framed slider or a basic door. Some leave the opening for a curtain rod.
If you want heavier frameless glass, a different layout or a specific finish, ask your builder whether you can skip their enclosure. Then bring in your own glass company after closing. Ask how it affects the builder's warranty on the shower before you decide.
What to decide before the measure
Your installer will walk you through these, but it helps to think about them first.
- Door, fixed panel, or a walk-in panel with no door
- Which way the door swings, so it clears the vanity and toilet
- Clear or frosted glass
- Hardware finish to match your faucets
- Whether you want a coating that helps with hard water spots
Hard water in a brand new shower
Much of the Treasure Coast has hard water, and new glass shows spots fast. Start the squeegee habit on day one.
If you plan on a water softener, put it in early. Glass stays clear far longer when minerals aren't drying on it every day.
Timing your install
Custom glass is made after the measure, so plan on a wait between the two. If you have a move-in date, tell your glass company when you book. They'll tell you whether it's realistic before anything is ordered.














